Gippsland Water

Replacement of the Sale Sewerage Pump Station No.2

Value: 3.5M
Completion: June 2023

The Sale Sewerage Pump Station No. 2 was a challenging yet successful infrastructure project, replacing an aging pump station built in 1974. The new pump station has a greater capacity and improves the site's aesthetic appeal. The project's scope involved constructing two 5.5-meter-deep manholes, installing DN450 GRP gravity sewer mains, DN250 s/steel rising mains pipe, and Cassion constructing a new concrete wet well to a depth of approximately 7.5 meters below the surface. The project dealt with unstable ground, groundwater, and navigating overhead powerlines. Our team overcame these challenges through careful planning, a robust dewatering system, and learning on the many years of our teams' combined field experience. The project also involved demolishing the old pump station, removing redundant pumps, electrical cabling, odour control, and retrofitting the old wet and dry wells for emergency storage. The site was reinstated, and the project was completed with the construction of new concrete slabs, driveways, crossovers, and a Colourbond perimeter fence.

Tequa is proud to have played a crucial role in the project, representing a significant investment in the town's infrastructure. With the new pump station's increased capacity and efficiency, the Sale community can expect a reliable supply of sewerage services for years to come, significantly impacting the community's well-being and quality of life.

Services Provided

Sewer, Water and Gas
Pipeline Installation

Project Management

Conduit Installation and
Cable Hauling

General Civil Works

Sewer Pump Stations

Open Trenching

Trenchless Direcitonal Drilling

VEDN Compliant

Service Locations – BYDA Accreditation (Dial Before You Dig)

Hydro Excavation

Emergency Repairs to Mains

Pipeline Butt Welding and Electrofusion Welding

Our Service Area

We service the entirety of Gippsland from our locations in Bairnsdale, Sale and Traralgon – from Warragul in the west, to Mallacoota in the east. We are driven to exceed expectations for our customers through the commitment of our engaged team and combination of industry innovation.

  • Bairnsdale

  • Briagolong

  • Bruthen

  • Buchan

  • Dargo

  • Heyfield

  • Lakes Entrance

  • Licola

  • Loch Sport

  • Maffra

  • Mirboo North

  • Moe

  • Morwell

  • Sale

  • Stratford

  • Thorpdale

  • Trafalgar

  • Traralgon

  • Tyers

  • Willow Grove

  • Yarram

Our promise is to "Exceed Expectations." We put this into practice everyday on all projects big or small. You can expect a dedicated team and manager who will look after your job from start to finish with a solutions focused mindset. We know communication is key and we are here to help 24 hours a day, 7 days a week via phone or email. 

The Tequa difference

Previous
Previous

Fulham Correctional Centre Expansion

Next
Next

RAAF Base East Sale